Job Details


Permanent Way


Chief Track Technical Manager  Virar,   Posted: 12/9/2024
Job Description

Job ID#:

14980

Discipline:

Permanent Way

Language:

English


Our client is seeking a Chief Track Technical Manager to work on the Mumbai-Ahmedabad HSR project.
 
Work Location: Virar, India
Required Mobilization: June 2025
 
The Project will connect Mumbai and Ahmedabad with a fully dedicated double-track HSR whose total length is approximately 500 km (Mumbai-Sabarmati: 506 km, Mumbai-Sabarmati Depot: 508 km). On the Mumbai side, the line will run through an underground tunnel across the Thane Creek to an underground station at Bandra Kurla Complex. On the Ahmedabad side, the line will run over viaducts to the stations at Vadodara, Ahmedabad, and Sabarmati, abutting on the existing Indian Railway stations for the convenience of the transfer of passengers between the stations.  Basically, viaduct structures will be adopted. A total of 12 stations will be planned with three depots, at an average interval of 50-km.

 
Job Requirements

 

- Bachelor Degree holder of Engineering, Science, Technology or Agriculture
- Total experience of 13 years or more
- 2 years of experience in Shinkansen/HSR in relevant field




 

Already have an account? Log in here