Our client is seeking a Rolling Stock Technical Expert to support their activities in Hanoi, Vietnam for works including Hanoi's five major new metro lines (Lines 1, 2, 8, 10, and 14).
Hanoi Five-Line Metro Program scope covers five new urban railway lines spanning over 303.5 km with an estimated total investment of VND 1.3 quadrillion (US$49.4 billion). Groundbreaking took place on June 22, 2026, with an ambitious target to substantially complete the lines by 2030.Included Lines: Line 1, Line 2, Line 8, Line 10, and Line 14 connecting key nodes like Noi Bai Airport, Ngoc Hoi, and Ocean Park.
Responsibilities:
- Review physical parameters and design of rolling stock, and depot equipment;
- Supervise on-site physical layer construction quality;
- Propose physical layer interoperability optimization suggestions.
Full time based in Hanoi.